Main Image: |
This pressure regulating station, designed by DBE in conjunction with the City’s Phase I recycled water distribution system, maintains a back-pressure on the upper zone while it is the sole source of supply to the closed lower zone. Instrumentation and telemetry to the Recycled Water Booster Pumping Station are included in the PRS. |
Main Image: |
DBE designed this pressure reducing station and over one mile of reclaimed water pipeline. This project required coordination with multiple agencies including road realignment design and construction. Additionally, DBE provided construction plans, specifications and bidding documents. |
Main Image: |
DBE designed a pressure and flow control connection to the OCWD recycled water system for conversion of C. J. Segarstrom and Sons’ Home Ranch Irrigation System for emergency irrigation of their lima bean crop. |
Main Image: |
Enter Description for # 3 |