This $4 million lift station included a reinforced concrete rectangular covered basin for emergency off-line storage, 450 KW standby generator, odor control air scrubber and 150 HP variable speed drive dry well sewage pumps. Handicap access was provided into the ground level of the three level architectural building. |
Main Image: |
The State Park Lift Station is located directly on the beach in Doheny State Park. The Beach Road station is located a mile southerly, between two beach front homes along Beach Road. This project resulted in a complete rehabilitation of both stations including structural modifications to the wet/dry well, new pumping, valves, piping, electrical, controls and instrumentation. The design criterion was for a critical facility requiring fail-safe operation. |
Main Image: |
As its name implies, this station was located at the midpoint of a sewer force main serving a large new development. Sizing and hydraulics were coordinated with the firm designing the lower station. This facility has a design capacity of 1,060 GPM and includes surge protection and odor control. No photos, not yet into construction. |
Main Image: |
Enter Description for # 3 |